Lower level finished, track installed, first run

The lower level of the module is now finished and all the track have been installed.

The first ever run on this new module was done tonight. Not a complete round because the tracks in the yard are not connected to power yet, but the front part has been tested.

All visible parts have got MTL track, hidden part have got some Märklin track and some Peco flextrack. I could have used MTL all over, but I have plenty of the other track and try to use Märklin and Peco in hidden areas.

  

Check out video: