A lot of activity finally documented The last months I have been busy with a lot of different parts on the layout, from installing Led String Lighting for the layout, making of the fascia front, finishing trackwork and all the track wiring, including Power Distribution Panel and the conventional block switches for part of the yards to be used with traditional DC Power. Since my main power will be DCC, only a few tracks have switches. The power is divided into several Power Districts, giving the possibility to run both DCC and DC at the same time on different part of the layout. Near all tracks are painted and the first landscaping have started to be done. Finally I have taken some more pictures to document the progress. Enjoy! Read more about the Power Districts and the final as built layout drawing here. 27/03/2012 Categories: Jakobs Creek RR