Detailing in progress A lot of work have been done on the rockwork and on the vegetation along the line. Below you can see 2 images from different parts of the layout. 30/12/2013 Categories: Jakobs Creek RR
Support wall for lower line installed The support wall for the lower line has been installed. Some rock pieces are installed. 20/12/2013 Categories: Jakobs Creek RR