The layout has been expanded with a switching yard and some industrie spurs on lower level.
In this view we have filled up the entire yard with a lot of equipment.
![](/mrr/zlayout2009/z-anlegg_2009_rev0_v4-3d.jpg)
![](/mrr/zlayout2009/z-anlegg_2009_rev0_v4-t.jpg)
The revised and now current plans for the new layout: Select different levels.
There will be a lot of custombuild curved turnouts in the switching yard.