Posts From November, 2016

Jakobs Creek Work in progress

It take some time to finish this part of the layout, but now some plaster is added between some of the rockpieces. I need to mold some more rocks also. Still a lot of blue styrofoam that should be covered.

One more bridge is installed. Still missing some support for the bridges. Check out the images.

 

   

 

Jakobs Creek Stone Arch Bridge

The styren base for the main bridge over Jakobs Creek start to live. The bridge is cut out of 0,5 mm styren. Need some more work, and some basement structures, but I think it will work.