| Have
you ZZeen it?
Expandig my Z-scale model
railroad with new sections
| Parts of the old layout was
finished in 1991, like the bridge you can see picture of on
the left side of this
page.
The model is very little, the bridge mainspan is only 20 mm
high.
The modell of the bridge is scratch-build, using small pieces
of wood, a total of more than 1600 pieces of Northlands are used.
|
 |
Expanding the old layout
There has been no activity
on the layout for some years, in spring 2002 the major part of
the old layout was destroyed, and planning for e new extension
was in work during the winter 2001-2002. The new layout
will be with much less track, so the old "spaghetti"-style
layout will not be continued. Only the small section
(100x60cm) from the old layout, with the big wood trestle,
will be saved for the new layout. That part will also be
remodeled, with new rock castings, more trees and new colors.
The new layout will be build in at least two stages, the first
section will be a complete solution, and it can be extended
with another stage, to give even more tracklength to run the
nice little trains on.
There are slow progress
in the building of the new layout, but some work are normally
been done from
week to week. Stay tuned and come back soon for an update:
Last update:
17.08.2005 09:51
This page is for 2005. Want to see more? Go
directly to the page
for 2004, 2003 or
2002
Status from the
layout on 01.01.05:
| And what will happen in
2005? Stay tuned............
Check out
2004 first............ |
|
You want to see more? Continue with
page
for 2004, 2003 or
2002
|