All tracks, turnouts, motors and electric wiring are installed and working on Low level. All decoders and turnout motors are installed on top of the plywood, because all equipment will be covered by the high level. Access to the equipment will be possible via removable panels.
All the tracks are working well, no derailment in the turnouts. Its time to continue with high level and the installment of turnoutmotors and wiring.
Check out the first testrun on the Zity Edge Layout. The Low Level track is ready for action.